EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (844)
Research
Workshop
- (13)
Fuselage
- (381)
Firewall
- (21)
Tail Feathers
- (167)
Wings
- (87)
Controls
- (21)
Avionics
- (11)
Electrical Syst.
- (3)
Instrument Panel
- (4)
Landing Gear
- (16)
-
46-06 Engine Mount...
-
46-05 Engine Mount...
-
46-04 Engine Mount...
-
46-4 Engine Mount...
-
46-03 Mount and...
-
46-02 Engine Mount...
-
46-4 Engine mount...
-
38-3 Beringer Brake...
-
Beringer Brake and...
-
29-10 New Landing...
-
29-10 New Landing...
-
29-10 New Landing...
-
29-10 New Landing...
-
29-10 New Landing...
-
29-10 New Landing...
-
29-10 Fuse Side...
Engine
- (20)
Propeller
- (2)
Fuel System
- (9)
Interior Finish
- (17)
Paint / Decals
- (1)
Inspection
Tools
- (3)
Auto Entry
SB & Letters
- (14)
Equipments
- (2)
Brake System
- (31)
Doors
- (21)
Builder Name:
paolo cavosi
-
Project:
Vans - RV-10
Total Hours:
2429.2
Total Flight Time:
Start/Last Date:
May 28, 2019 - No Finish Date
Engine:
IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:
MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=I-CAVS
Home or Last Project Picture
Dec 12, 2023
Beringer Brake and Wheel assembly
- (5 hours)
Category: Landing Gear
Identified the different parts (VANS and Beringer) for Wheel and brake assembly. Preliminary assembly of the Brake and Wheel Assembly.
IMG_5376.jpg
IMG_5377.jpg
IMG_5379.jpg
IMG_5380.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.